The project consultants/
detailed engineering contractors are selected by the owners setting up the
plant based on the detailed engineering companies experience in their previous projects,
the resources that company have to execute the project and their collaborators
who can extend their support during execution of the project including the
technical knowhow the project consultant they have of their own or with tie up
with their collaborators. Even though the detailed Engineering consultant
posses major above said qualities the cost element plays a vital role while
selecting the project consultant by the owner. Hence it becomes very much
necessary for the project consultant also to optimise their cost to secure the
contract with the owner. In normal circumstances all the companies wants to
save the cost of the project from day one which will help in completion of the
project within the budgeted cost. .The owner starts control process with floating of tenders to various
project/detailed engineering consultants . The project consultants/ detailed
engineering contractors starts working in their estimate with basic inputs provided by the owner and
develop the mass flow/ heat flow diagrams. The basic main important equipment
details are provided by owner or by the
process licenciator. On development of the said drawings the detailed
engineering contractors calculate the number of drawings which may be required
to be designed and detailed by them during the execution of the project. The
number of P&I diagrams required, the number of isometrics to be designed
etc are calculated by the companies. If the owner further wants the contractor
to carry out other services like monitoring of supply of equipments,
supervision of civil, mechanical, electrical & instrumentation works .The
consulting companies start calculating the man-hours required to be spend by
the company for developing whole project drawings and number of man hours going
to be spent on other activities. Based on market rates of Engineers/technicians
and other category personals required
for that project the total cost of the consultants are calculated. In
case of any tie up required from partners of other nations the cost of that is also included. Finally
considering the overheads and profit margin that particular company maintains
are included to arrive at the final quotation cost by the project consultants
Blogg written based on my 40 years practical experience in core industrial project o various issues related to project management and construction management. this is the on site picture rather than book calculations
Showing posts with label cost. Show all posts
Showing posts with label cost. Show all posts
Friday, 9 December 2016
Thursday, 24 November 2016
Basic Elements of construction cost Estimate
On
receipt of the construction bids the company decides their participation based
on the principles of the companies quoting for the bid. Once decided to participate
in the race for the work with other competitors the strength and weakness is
analysed and strategies are made to hit the work. The estimator starts work on
the bid. While estimating at what cost the work to be quoted the minute details
and requirements of the client is to be understood. Because each requirement
mentioned in the bid by the owner has
cost implication for the company participating and the estimator to calculate
the cost for each item mentioned. .Let us consider the company participates in
a mechanical erection works the minimum basic items to be considered by the
estimator are
1.
Direct manpower cost
2.
Indirect manpower cost
3.
Cost of consumables to be used for that
work
4.
Heavy equipment hire charges
5.
Non destructive testing and other
testing requirement cost
6.
Cost of maintenance of tools going to be
used
7.
Amount to be spent on documentation for
obtaining statutory requirements
8.
Arrangements to be made onsite cost
9.
Arrangement for stay of persons at site
10.
Expenses incurred at corporate office on
account of this work
11.
Salary of the officers/staff working at
site
The details
mentioned are the basic cost to be considered .over and above any special
requirement of owners cost also to be included in the cost. The sum of total of
the said cost becomes the basic cost for completion of the works. However all
the companies work towards earning their profit which is not included in the
above calculated cost. Erection works are very dangerous in nature. Hence
workers and staff persons who will involve in the works are also to be covered
under some safety scheme which is not covered in the above cost. With all possibilities
for various reasons like lack of time, not getting the required correct input
in time delay from subordinates in compilation of the work and many other
reasons may leave the estimator in omission of certain items in the bid which
is to be covered in the form of contingencies.. On various stages of quoting
the work many types of guarantees are required by the owner/client of the
project which in turn cannot be given by any company as cash. So some of the
bankers of the company stand guarantee for the amount and it is normally
accepted by the owner in their own accepted format which in turn was already approved by their bankers. Such
type of guarantees is given for non withdrawal of the bid after the specified
date mentioned in owners document. Likewise for the performance of the work carried
out by the contractor and for any major defects caused in their work. In many cases the bank Guarantee
formats are discussed between the contractor and owner on award of contract for all guarantees except
for bid gurantee.Normally it is common practice in India for execution of the
work the estimated amount is not totally spend by the company of their own.
There are lenders and financers who is ready to help the companies on good will
and with some interest for the amount given by them. Such interest amounts are
not normally added in the cost of the work before taking it further with owner
for finalisation. Even when we go for any purchase we are not satisfied by the
sale price mentioned in the tag. Everyone is happy with the discounts and
reduction in price. Same principle apply here too. On finalisation of the
contract the owner too wants reduction in the sale price of that work and the
contractor always keep provisions on the calculation to pass it on to the owner
and to clinch the contract. To execute the work from corporate/regional/head
offices the indirect expenses spent while executing the project needs to be
considered..Every company based on its size and volume have their own norms for
this purpose and it is being communicated to the estimator to add it up along
with other expenses. Addition of the total basic cost along with the above said
hidden cost forms the basis for the cost of the work. On further discussions
and requirement for that particular work for the company the cost is revisited
and finalised and submitted to the owner,
Labels:
Bankgurantee,
consumable,
cost,
Directmanpower,
equipmet,
heavy equipment,
hire,
indirect manpower,
margin,
Nondestructive,
test
Location:
India
Types of contracts
In my Blog i would like to
describe the general procedure for preparation of quotation when the company
receive the enquiry from the client. Initially the received bid is thou roughly
scrutinised for the worth of quoting the bid. The nature and financial
involvement is assessed by viewing the bid. The bid may be a normal Labour
contract, only a small infra structure civil contract, only a part package of
the project , may be either Engineering,Procurement and construction project or
a normal erection contract .
Labour contracts :Every
company in India have their own policies in selection of the work for
execution. Some contracting companies
wish to participate in all works of construction. It may be a civil contract,
mechanical contract, electrical contract others which is purely construction in
nature. This means whatever materials related to the construction activities
either consumables or construction materials every item will be supplied by the
client. Only labour portion of the contract will be carried out by the
contracting company. The contract value of which will be very less. The
contractors who have labours under their control wishes to execute such bids.
Bigger companies with their own resources don’t wish to participate in such
bids
LABOUR CONTRACTOR WITH
WORKERS
Civil contracts :
When the owner wishes to control the cost of the project normally the infr tructure facilities like local roads( Temperorary in nature) to be provided
for their Engineering, rocurement and contraction contractor ,they develop the
facilities with their own officers and only hiring a medium sized contractor
who can carry out such projects ( Mostly from local area) are selected. In such
cases the civil materials like bricks, sand,rebar,metal etc.According to
clarifications ,contractors are classified as Class A,B,C based on their resources
and financial capabilities. When the work starts the design and darwings required
for execution of the works are normally prepared by the design and engineering
contractor selected by the owner of the project and the execution at site is
being carried out by the officers of the owner.
Buil Building Contractor
Packaging Route :
Certain clients having sufficient workforce implements the project on package route. It means the major equipments and material procurement actions are taken
care by the owner himself and units forming part of the project which are
readily available in market with sufficient experience in that particular field
are purchased by owner. In the presence of the representative of the package
supplier the client himself hire a small contractor and under the guidance of
package vendor the contractor completes the works of the package. Normally the
value of contracts are normally less except for major erections like boilers of
higher capacity. Based on the size and capacity of the package the client
choose a contractor who has sufficient experience in that particular field
along with financial capabilities. In case
the client wants to capture good reputed contractors for installation
they combine major packages together to increase the contract value of the
installation.
Erection Contracts :
When big factories are set up for the production of power, fertilizer
,petrochemicals and ore beneficiation plants the volume of items to be
installed are huge and many and in most of the cases such items can not be
handled by client himself. Hence it becomes absolutely necessary for him to
engage a standard contractor to carry out major installation works. The
erection works are complex in nature and involves installation of many items
like structural steel, Heavy equipments, rotary equipments, pipe line works
with various materials of construction . To handle such a big volume of work it
may not possible either by a small or a medium sized contractor. Hence the
client/ owner has no option except to select a contractor with good financial
capability along with their own major resources to execute the work in time
with quality. Contracts of that nature
are being handled by big contracting companies in the country.
Read my next post regarding cost estimation of Erection
contracts
Subscribe to: